Project quality plan PQP
The term 'quality assurance' describes a set of planned, systematic actions to ensure that products and services comply with specified requirements. It not only involves checking the final quality of products to avoid defects, as is the case in quality control, but also checking product quality in a planned way through all the production stages. It is the development of work and product design procedures to prevent errors from occurring in the first place, based on planning, backed up by quality manuals and tools.
A project quality plan (PQP), sometimes referred to as a quality management plan, quality assurance plan or project quality management plan, is a project-specific quality plan that describes the activities, standards, tools and processes necessary to achieve quality in the delivery of a project.
It is sometimes considered to be interchangeable with the project execution plan (PEP) which sets out the overall strategy for managing the project, describing who does what and how, and defining the policies, procedures and priorities that will be adopted.
RIBA suggest that the PEP or PQP helps track and control projects which can progress erratically and intermittently and should pass the ‘what happens if ‘Fred’ is knocked-down by a bus’ test, describing the project and processes in such a way that competent people could take over the project and maintain the program, service and performance.
However, on large projects, the project execution plan might be an overarching document that includes (or references) a number of more detailed plans focusing on specific issues such as; the project quality plan, health and safety plan, risk management plan, value management plan, stakeholder management plan, and so on.
For more information, see Project Execution Plan.
The project quality plan should:
- Provide explanatory text describing the nature of the project and the quality expectations.
- Set out the organisations quality policies (for example, if they are ISO 9001 certified) and how these policies will apply to the project.
- Identify other quality criteria or policies that may need to be followed, such as the requirements of clients or funders.
- Describe how quality requirements will cascade down through the supply chain.
- Describe the activities necessary to deliver the project and the order in which they will be carried out.
- Describe the resources required.
- Set out quality roles and responsibilities.
- Identify the standards that will apply.
- Describe monitoring and reporting procedures and the process for delivering continuous improvement.
- Describe procedures for dealing with defects.
- Describe document control procedures.
- Describe change control procedures.
- Set out any training requirements.
- Schedule tools that will be used.
- List reference material.
Some of these elements may be common to all projects, however, the PQP should not duplicate information that is available elsewhere (but rather should reference it), and it should be project specific, rather than an a generic box-ticking exercise.
[edit] Related articles
- BIM Execution Plan.
- Briefing documents.
- Collaborative practices.
- Change control procedure.
- Construction quality.
- Design quality.
- Document control.
- Project implementation plan (for BIM).
- Quality control.
- Quality in construction projects.
- Quality management systems (QMS) - beyond the documentation.
- Quality manuals and quality plans.
- Record keeping.
- Schedule of services.
- Site inspection.
- Site inspector.
- Total quality management in construction.
- Value management.
- Workmanship.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
Comments